STATEMENT OF PROBLEM
One of the biggest problems associated with most of the construction projects in Nigeria today is problem of delays and disruptions at both the pre-contract and post-contract stages of construction in building and civil engineering works.
The cost of building increases at the cause of delays and disruption in construction because of variation. many construction project in Enugu needed huge capital outlay and time to execute them and any attempt to delaying and disrupting the construction proper will result to terrible consequences that will affect the economical control and building cost.
1.3 PURPOSE OF THE STUDY
The purpose of this study is as follows –
ABSTRACT
The study investigated the Economic Impact of poultry production in Nigerian Katsina State based on the tot...
Background of the Study
The educational sector, as a key conduit for a country’s well-being, dese...
ABSTRACT
The study attempted to examine the relationship between teacher preparation, professional development and stude...
Abstract
Terrorists have recourse to violence against the proprietors of the monopoly on the legitimate...
BACKGROUND OF THE STUDY
Glycerine (propan 1, 2, 3 triol) is a discovered soluble in soap lye and as a residue in c...
Over the years, paper-based system for information managem...
Background Of The Study
The Treasury single account is a banking arrangement that was put into place in...
Abstract
The study looked into the assessment of fingerprint authentication system for ATM security. Sp...
STATEMENT OF PROBLEM
Presently, the number of corporate supermarkets operating in Abakaliki metropolis...
ABSTRACT
In 2003 the cabotage law was enacted with provisions to empower local investors to take contr...